§ 2462. Notice and failure to make required connection.
67 words·~1 min read·
/pa/title-8/chapter-24/2462A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
§ 2462. Notice and failure to make required connection.
An owner shall be given at least 45 days' notice of any ordinance requiring a water connection, and, upon failure of the owner to make the required connection, the borough may make the connection and collect the cost from the owner by a municipal claim or in an action of assumpsit. All connections required shall be uniform.
08c2463s