Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Pennsylvania · Title 75 — VEHICLES · Chapter 61

§ 6123. Erection of traffic-control devices while working.

301 words·~1 min read·/pa/title-75/chapter-61/6123

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

§ 6123. Erection of traffic-control devices while working.
(a)General rule.-- Any person performing any work on or near the roadway which may create hazards shall erect traffic-control devices in accordance with the rules and regulations of the department for the maintenance and protection of traffic. The regulations of the department shall address the control of road users through a work zone and shall be an essential part of highway construction, utility work, maintenance operations and incident management. All official traffic-control devices erected for maintenance and protection of traffic shall be removed as soon as practical when they are no longer needed. When work is suspended for short periods of time, official traffic-control devices erected for the maintenance and protection of traffic shall be removed or covered when they are no longer appropriate.
(b)Length of work zone.-- To the extent practicable, the length of the work zone shall be appropriate to the work in progress so that motorists do not increase speed after passing through a long stretch with no sign of work activity.
(c)Lane restrictions to be minimized.-- To the extent practical, lane restrictions in all work zones shall be minimized to prevent traffic congestion and unsafe traffic conditions.
(d)Responsibility of contractor.-- If the department determines that a contractor or any subcontractor has failed to comply with specifications prescribed by the department for the control of traffic within a work zone on a highway within this Commonwealth, a sum of not less than $1,000 per day shall be assessed as liquidated damages from money due or to become due to the contractor.
75c6123v
(Dec. 23, 2002, P.L.1982, No.229)
2002 Amendment. Act 229 amended the entire section, effective in six months as to subsecs.
(a)and
(d)and 60 days as to the remainder of the section.
75c6123.1s
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.