Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Nevada · CHAPTER 455 - EXCAVATIONS AND HIGH-VOLTAGE LINES

NRS 455.110 Notification of association for operators required; marking proposed area of excavation or demolition; exception.

306 words·~1 min read·/nv/chapter-455-excavations-and-high-voltage-lines/455-110·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

NRS 455.110 Notification of association for operators required; marking proposed area of excavation or demolition; exception.
1. Except as otherwise provided in subsection 2, a person shall not begin an excavation or demolition if the excavation or demolition is to be conducted in an area that is known or reasonably should be known to contain a subsurface installation, except a subsurface installation owned or operated by the person conducting the excavation or demolition, unless the person:
(a)Notifies the appropriate association for operators pursuant to NRS 455.120 , at least 2 working days but not more than 28 calendar days before excavation or demolition is scheduled to commence. The notification may be written or provided by telephone and must state the name, address and telephone number of the person who is responsible for the excavation or demolition, the starting date of the excavation or demolition, anticipated duration and type of excavation or demolition to be conducted, the specific area of the excavation or demolition and whether explosives are to be used.
(b)Cooperates with the operator in locating and identifying its subsurface installation by:
(1)Meeting with its representative as requested; and
(2)Making a reasonable effort that is consistent with the practice in the industry to mark with white paint, flags, stakes, whiskers or another method that is agreed to by the operator and the person who is responsible for the excavation or demolition, the proposed area of the excavation or demolition.
2. A person responsible for emergency excavation or demolition is not required to comply with the provisions of subsection 1 if there is a substantial likelihood that loss of life, health or property will result before the provisions of subsection 1 can be fully complied with. The person shall notify the operator of the action the person has taken as soon as practicable.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.