13-1-124.3. Definitions.

329 words·~1 min read·/nm/chapter-13-public-purchases-and-property/article-1-procurement/13-1-124-3·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

As used in the Educational Facility Construction Manager At Risk Act [13-1-124.1 to 13-1-124.5 NMSA 1978]:
A. "construction manager at risk" means a person who, pursuant to a contract with a governing body, provides the preconstruction services and construction management required in a construction manager at risk delivery method;
B. "construction manager at risk delivery method" means a construction method for an educational facility wherein a construction manager at risk provides a range of preconstruction services and construction management, including cost estimation and consultation regarding the design of the building project, preparation and coordination of bid packages, scheduling, cost control, value engineering and, while acting as the general contractor during construction, detailing the trade contractor scope of work, holding the trade contracts and other subcontracts, prequalifying and evaluating trade contractors and subcontractors and providing management and construction services, all at a guaranteed maximum price for which the construction manager at risk is financially responsible;
C. "educational facility" means a public school, including a locally chartered or state- chartered charter school or a facility of a state educational institution listed in Section 6- 17-1.1 NMSA 1978;
D. "governing body" means:
(1)the public school facilities authority if the authority is the using agency that requires the construction of an educational facility;
(2)a local school board if the board is the using agency that requires the construction of an educational facility;
(3)the governing body of a charter school if the governing body is the using agency that requires the construction of an educational facility; or
(4)the governing body of a state educational institution if the governing body is the using agency that requires the construction of an educational facility; and
E. "guaranteed maximum price" means the maximum amount to be paid by the governing body for the construction of the educational facility, including the cost of the work, the general conditions and the fees charged by the construction manager at risk.
History: Laws 2007, ch. 141, § 5.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.