Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Nebraska · Chapter 54 — Livestock

54-2419. Permits; approval; conditions; restrictions.

395 words·~2 min read·/ne/chapter-54/54-2419

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(1)No new animal feeding operation shall be issued a National Pollutant Discharge Elimination System permit or a construction and operating permit in any part of a watershed that feeds directly or indirectly into a cold water class A stream, delineated pursuant to section 54-2421 .
(2)An existing animal feeding operation may not expand if its livestock waste control facility is located within one mile of a designated cold water class A stream segment delineated pursuant to section 54-2421 and the same cold water class A stream watershed as the animal feeding operation, except that an existing animal feeding operation used for research sponsored by the University of Nebraska at a facility owned by the University of Nebraska may expand if the department determines based on scientific information provided in the application or other available scientific information that the proposed expansion does not pose a potential threat to the stream.
(3)Existing animal feeding operations may receive a new or modified National Pollutant Discharge Elimination System permit, a new or modified construction and operating permit, a modified operating permit, or a modified construction approval if:
(a)The existing animal feeding operation does not currently have a National Pollutant Discharge Elimination System permit or a construction and operating permit and upon inspection by the department a determination is made that one is necessary;
(b)The existing animal feeding operation modifies its operation but does not expand its approved livestock waste control facility;
(c)The existing animal feeding operation's livestock waste control facility is located more than two miles from a designated cold water class A stream segment delineated pursuant to section 54-2421 and in the same cold water class A stream watershed as the animal feeding operation; or
(d)The existing animal feeding operation or livestock waste control facility is located less than two miles but more than one mile from a cold water class A stream delineated pursuant to section 54-2421 , and the department determines based on scientific information provided in the application or other available scientific information that the proposed expansion does not pose a potential threat to the stream.
(4)The department may deny or restrict an application for a transfer or major modification of an existing National Pollutant Discharge Elimination System permit or a construction and operating permit based upon the potential degradation of a cold water class A stream.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.