39-1818. Water impoundment structure; approval; criteria considered.
153 words·~1 min read·
/ne/chapter-39/39-1818A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
A water impoundment structure which will result in temporary storage and flowage of water upon, across, or adjacent to a road upstream from such structure may be approved only if such road would not be inundated because of the storage in such structure of waters from a ten-year, twenty-four-hour or lesser frequency storm. A water impoundment structure which will also serve as a roadbed may be approved and constructed only if the structure would contain the runoff from a twenty-five-year, twenty-four-hour frequency storm without water overtopping such structure or being discharged through its emergency spillway, except that if the road which is subject to such inundation is classified as a local road or remote residential road with current average daily traffic of fifty vehicles or less, the containment of a ten-year, twenty-four-hour frequency storm shall be sufficient.
In making the storm frequency determinations required by this section, any recognized method may be used.