Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Minnesota · Chapter 169

169.8655 SPECIAL SUGAR BEET HAULING VEHICLE PERMIT.

315 words·~1 min read·/mn/chapter-169/169-8655

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

169.8655 SPECIAL SUGAR BEET HAULING VEHICLE PERMIT.
§
Subdivision 1. 122,000-pound vehicles; East Grand Forks.
A road authority may issue a permit for a vehicle or combination of vehicles that transports sugar beets and meets the following requirements:
(1)does not exceed a maximum gross vehicle weight of 122,000 pounds;
(2)does not use a semitrailer in a combination of vehicles that has an overall length in excess of 28-1/2 feet; and
(3)is only for operation on the following roads in East Grand Forks:
(i)U.S. Highway 2 between the North Dakota border and Fifth Avenue Northeast;
(ii)Fifth Avenue Northeast between U.S. Highway 2 and Business Highway 2; and
(iii)Business Highway 2 from Fifth Avenue Northeast to the sugar beet processing facility on Business Highway 2.
§
Subd. 2. Requirements; restrictions.
(a)A vehicle or combination of vehicles issued a permit under subdivision 1:
(1)is subject to axle weight limitations under section 169.824, subdivision 1 ;
(2)is subject to seasonal load restrictions under section 169.87 ;
(3)is subject to bridge load limits posted under section 169.84 ;
(4)may not be operated with a load that exceeds the tire manufacturer's recommended load limit under section 169.823 , the manufacturer's gross vehicle weight rating as affixed to the vehicle, or other certification of gross weight rating under Code of Federal Regulations, title 49, sections 567.4 to 567.7; and
(5)may not be operated on the interstate highway system.
(b)The seasonal weight increases authorized under section 169.826 do not apply to a vehicle or combination of vehicles operating under this section.
§
Subd. 3. Permit fee.
A permit issued under this section must be an annual permit. A permit issued under this section may only be issued before July 1, 2027. The fee for permits issued under this section is $300 and must be deposited in the trunk highway fund.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.