103E.265 ORDER FOR DETAILED SURVEY AND SURVEY REPORT.
§
Subdivision 1. Order.
When the preliminary hearing order is filed with the auditor, the drainage authority shall order the engineer to make a detailed survey with plans and specifications for the proposed drainage project and submit a detailed survey report to the drainage authority as soon as possible.
§
Subd. 2. Waiver.
The drainage authority may waive the detailed survey order and the detailed survey if it determines that adequate data, plans, and specifications have been furnished by a United States engineer.