460.1153 Notice; conduct of proceeding; determination by commission that requirements are met; precedence; certificate as conclusive and binding; time period for granting

565 words·~3 min read·/mi/chapter-460/460-1153

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

460.1153 Notice; conduct of proceeding; determination by commission that requirements are met; precedence; certificate as conclusive and binding; time period for granting or denying certificate.
Sec. 153.
(1)Upon applying for a certificate, an electric utility, affiliated transmission company, or independent transmission company shall give public notice in the manner and form the commission prescribes of an opportunity to comment on and participate in a contested case with respect to the application. Notice shall be published in a newspaper of general circulation in the relevant wind energy resource zone within a reasonable time period after an application is provided to the commission and shall be sent to each affected municipality, electric utility, affiliated transmission company, and independent transmission company and each affected landowner on whose property a portion of the proposed transmission line will be constructed. The notice shall be written in plain, nontechnical, and easily understood terms and shall contain a title that includes the name of the electric utility, affiliated transmission company, or independent transmission company and the words "Notice of Intent to Construct a Transmission Line to Serve a Wind Energy Resource Zone".
(2)The commission shall conduct a proceeding on the application for an expedited siting certificate as a contested case under the administrative procedures act of 1969, 1969 PA 306, MCL 24.201 to 24.328. Upon receiving an application for a certificate, each affected municipality and each affected landowner shall be granted full intervener status as of right in commission proceedings concerning the proposed transmission lines.
(3)The commission shall grant an expedited siting certificate if it determines that all of the following requirements are met:
(a)The proposed transmission line will facilitate transmission of electricity generated by wind energy conversion systems located in a wind energy resource zone.
(b)The proposed transmission line has received federal approval.
(c)The proposed transmission line does not represent an unreasonable threat to the public convenience, health, and safety.
(d)The proposed transmission line will be of appropriate capability to enable the wind potential of the wind energy resource zone to be realized.
(e)The proposed or alternate route to be authorized by the expedited siting certificate is feasible and reasonable.
(4)If the commission grants an expedited siting certificate for a transmission line under this part, the certificate takes precedence over a conflicting local ordinance, law, rule, regulation, policy, or practice that prohibits or regulates the location or construction of the transmission line. A zoning ordinance or limitation imposed after an electric utility, affiliated transmission company, or independent transmission company files for a certificate shall not limit or impair the transmission line's construction, operation, or maintenance.
(5)In an eminent domain or other related proceeding arising out of or related to a transmission line for which a certificate is issued, a certificate issued under this act is conclusive and binding as to the public convenience and necessity for that transmission line and its compatibility with the public health and safety or any zoning or land use requirements in effect when the application was filed.
(6)The commission has a maximum of 180 days to grant or deny an expedited siting certificate under this section.
History: 2008, Act 295 , Imd. Eff. Oct. 6, 2008
Compiler's Notes: Enacting section 1 of Act 295 of 2008 provides: "Enacting section 1. As provided in section 5 of 1846 RS 1, MCL 8.5, this act is severable."
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.