408.1103 Prevailing wage and fringe benefit rates; schedule as part of specifications and bid form.
135 words·~1 min read·
/mi/chapter-408/408-1103A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
408.1103 Prevailing wage and fringe benefit rates; schedule as part of specifications and bid form.
Sec. 3.
A contracting agent, before advertising for bids on a state project, shall have the commissioner determine the prevailing rates of wages and fringe benefits for all classes of construction mechanics called for in the contract. A schedule of these rates shall be made a part of the specifications for the work to be performed and shall be printed on the bidding forms where the work is to be done by contract. If a contract is not awarded or construction undertaken within 90 days of the date of the commissioner's determination of prevailing rates of wages and fringe benefits, the commissioner shall make a redetermination before the contract is awarded.
History: 2023, Act 10 , Eff. Feb. 13, 2024