45A.615 Life-cycle cost comparison of heating, ventilation, and air conditioning
93 words·~1 min read·
/ky/45a-615A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
equipment in state buildings.
(1)On every bid for new construction or for upgrading existing facilities that is
solicited under this chapter, the Finance and Administration Cabinet shall require,
where feasible, a life-cycle cost comparison of at least two
(2)types of energy-
efficient heating, ventilation, and air conditioning
(HVAC)equipment, including
geothermal equipment when feasible.
(2)The Finance and Administration Cabinet shall give particular consideration in the
awarding of a contract to energy-efficient HVAC equipment, including geothermal
equipment when feasible, having a lower or lowest life-cycle cost, all other factors
being equal.