Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Kentucky · Kentucky Revised Statutes

268.540 Construction -- Payment of cost and maintenance of bridge over drain

114 words·~1 min read·/ky/268-540

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

crossing right-of-way of railroad or other franchise corporation. If any drain is constructed in any district which crosses the right-of-way of a railroad or any corporation operating under a franchise, at any place other than at a natural depression in the earth or a watercourse, the railroad or corporation shall construct the bridge or culvert at the point where required. The expense shall be borne by the district, to be paid as part of the damages for the right-of-way in going across the railroad or corporation right-of-way and to be included in the judgment entered therefor.
The railroad company or the corporation shall thereafter maintain the bridge or culvert and make any necessary changes.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.