Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Kansas · Kansas Statutes

82a-2416. Same; specific projects; review of general plan.

340 words·~2 min read·/ks/82a-2416

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

82a-2416. Same; specific projects; review of general plan.
(a)Following the adoption of the general plan and adoption of the method of financing, the board of directors may determine the order in which specific projects contemplated by the general plan shall be undertaken. The board shall then cause accurate surveys of all work deemed necessary to be done and accurate estimates and calculations to be made by a competent engineer who shall prepare detailed construction plans and specifications showing the location, amount, and character of work to be done and the estimated cost of right of way, construction, maintenance and operation, which plans, specifications and estimates of costs shall be filed in the office of the secretary of the board and shall at all reasonable times be open to public inspection. The board shall carefully examine and consider the same and if they approve such plans, specifications and estimates of costs, they shall transmit a complete copy thereof to the director of the Kansas water office, who shall examine and study the plans and specifications as to conformance to the general plan and other applicable state laws on water use and control and transmit a written report of the results of the director's study and investigation to the board which report shall include any changes or modifications, which the director deems necessary, and which shall include a specific approval or disapproval of the plans and specifications.
(b)Ten years following approval of the general plan and every five years thereafter, the board shall review the general plan to determine if projects proposed to be undertaken by the district in its original plan are still feasible. A report of the review shall be given at a public meeting called for that purpose. This review is not required of reservoir improvement districts that have completed all the projects in the general plans.
Any revisions or amendments to the general plan shall be submitted to the director of the Kansas water office in the manner provided by K.S.A. 82a-2414 , and amendments thereto.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.