Sec. 26.10-9. Small design-build projects. In any case where the total overall cost of the project is estimated to be less than $12,000,000, the Chicago Park District may combine the two-phase procedure for design-build selection described in Section 26.10-8 into one combined step, provided that all the requirements of evaluation are performed in accordance with Section 26.10-8.