Sec. 7.5. Exposed facility.
(a)If any previously unmarked facility is exposed during excavation or demolition, emergency or nonemergency, the excavator responsible for the excavation or demolition operations shall immediately notify JULIE.
(b)At a minimum, the notice required under this Section shall provide:
(1)a reference to the original excavation or demolition notice, if one exists;
(2)the type of exposed facility, if known;
(3)the name of the affected underground utility facility owner or operator, if known;
and
(4)the location of the exposed facility at the excavation or demolition site.