309.35 When surveys required.
73 words·~1 min read·
/ia/chapter-309-secondary-roads/309-35A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Before proceeding to the construction of any road or roads included in the secondary road construction program where the grading, exclusive of bridges and culverts, is estimated to cost over ten thousand dollars per mile, the county engineer shall cause detailed surveys and plans for the road or roads to be prepared.
[C24, 27, §4643; C31, 35, §4644-c37; C39, §4644.35; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §309.35]