Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Hawaii · Chapter 269

[PART VI.] NET ENERGY METERING

381 words·~2 min read·/hi/chapter-269/part-vi-net-energy-metering·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

[PART VI.] NET ENERGY METERING
Law Journals and Reviews
A Tale of Two Solar Installations: How Electricity Regulations Impact Distributed Generation. 38 UH L. Rev. 135 (2016).
§269-101 Definitions. As used in this part:
"Eligible customer-generator" means a metered residential or commercial customer, including a government entity, of an electric utility who owns and operates a solar, wind turbine, biomass, or hydroelectric energy generating facility, or a hybrid system consisting of two or more of these facilities, that is:
(1)Located on the customer's premises;
(2)Operated in parallel with the utility's transmission and distribution facilities;
(3)In conformance with the utility's interconnection requirements; and
(4)Intended primarily to offset part or all of the customer's own electrical requirements.
"Net energy metering" means measuring the difference between the electricity supplied through the electric grid and the electricity generated by an eligible customer-generator and fed back to the electric grid over a monthly billing period; provided that:
(1)Net energy metering shall be accomplished using a single meter capable of registering the flow of electricity in two directions;
(2)An additional meter or meters to monitor the flow of electricity in each direction may be installed with the consent of the customer-generator, at the expense of the electric utility, and the additional metering shall be used only to provide the information necessary to accurately bill or credit the customer-generator, or to collect solar, wind turbine, biomass, or hydroelectric energy generating system performance information for research purposes;
(3)If the existing electrical meter of an eligible customer-generator is not capable of measuring the flow of electricity in two directions, the electric utility shall be responsible for all expenses involved in purchasing and installing a meter that is able to measure electricity flow in two directions;
(4)If an additional meter or meters are installed, the net energy metering calculation shall yield a result identical to that of a single meter; and
(5)An eligible customer-generator who already owns an existing solar, wind turbine, biomass, or hydroelectric energy generating facility, or a hybrid system consisting of two or more of these facilities, is eligible to receive net energy metering service in accordance with this part. [L 2001, c 272, pt of §6; am L 2004, c 99, §1; am L 2005, c 104, §2]
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.