[§431P-12] Mitigation.
61 words·~1 min read·
/hi/431p-12A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
[§431P-12] Mitigation. The fund shall develop a comprehensive loss reduction plan for the hurricane peril. The plan shall include standards for new residential and commercial structures and separate standards for existing residential and commercial structures. The plan shall provide a timetable for implementation of mandatory loss mitigation measures for both new and existing structures. [L 1993, c 339, pt of §2]