376.325 Alternative to containment and integrity plan requirements.
121 words·~1 min read·
/fl/title-xxviii/chapter-376/376-325A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
(1)As an alternative to the requirements of s. 376.324 , an owner or operator may choose to provide the department with certification by a professional engineer that no aboveground tank at the facility is in direct contact with the ground, and under and around each tank has been placed and sealed to its supports a secondary containment system which is either:
(a)Designed and built to contain in excess of 110 percent of the capacity of the largest tank within the containment; or
(b)Equipped with a drainage system routed to a permitted wastewater treatment system that is designed and built to contain accidental releases.
(2)All new and replacement tanks installed after July 1, 1992, shall have secondary containment.