Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · Florida · Title XXI — Drainage · Chapter 298

298.16 Appointment of district engineer; engineer’s duties.

419 words·~2 min read·/fl/title-xxi/chapter-298/298-16

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(1)Within 30 days after organizing, the board of supervisors shall appoint a district engineer, who may be an individual, copartnership, or corporation, and who shall engage such assistants as the board of supervisors may approve. Such district engineer shall faithfully and honestly perform all the duties required of him or her by said supervisors, and deliver to his or her successor all instruments, papers, maps, documents, and other things that may have come into the district engineer’s hands by virtue of his or her employment.
(2)The district engineer shall have control of the engineering work in said district and may, whenever he or she deems it necessary, confer with the jurisdictional water management district, and he or she may, by and with the consent of the board of supervisors, consult any eminent engineer and obtain his or her opinion and advice concerning the reclamation of lands in said districts. The said engineer shall make all necessary surveys of the lands within the boundary lines of said district, as described in the petition, and of all lands adjacent thereto that will be improved or reclaimed in part or in whole by any system of drainage that may be outlined and adopted.
(3)The engineer shall make a report in writing to the board of supervisors, with maps and profiles of said surveys, which report shall contain a full and complete water control plan for draining and reclaiming the lands described in the petition, or adjacent thereto, from overflow or damage by water, with the length, width, and depth of such canals, ditches, dikes or levees, or other works that may be necessary, in conjunction with any canals, drains, ditches, dikes, levees or other works heretofore constructed or built by the Board of Trustees of the Internal Improvement Trust Fund, or any other person, that may now be in process of construction, or which may be hereafter built by them, that may be necessary or which can be advantageously used in such water control plan; and also, an estimate of the costs of carrying out and completing the water control plan, including the cost of superintending the same and all incidental expenses in connection therewith. Maps and profiles shall also indicate so far as necessary the physical characteristics of the lands, and location of any public roads, railroads and other rights-of-way, roadways and other property or improvements located on such lands. A copy of the report required by this section shall be filed with the jurisdictional water management district.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.