§ 75541
63 words·~1 min read·
/ca/water-code/75541A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Within six months after the date of establishing a zone or zones, all water-producing facilities located within the boundaries of such zone or zones shall be registered with the district and, if required by the board, shall be measured with a water-measuring device satisfactory to the district, which shall be installed by the district or, at the district’s option, by the operator thereof.