§ 6302
127 words·~1 min read·
/ca/water-code/6302A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
For the purposes of this part, the estimated cost of a new dam or reservoir, or the enlargement, repair, alteration, or removal of an existing dam or reservoir shall include all of the following:
(a)The cost of all labor and materials entering into the construction of the dam and appurtenant works or reservoir
(b)The cost of preliminary investigations and surveys.
(c)The cost of the construction plant properly chargeable to the cost of the dam or reservoir.
(d)The labor costs of the owner for preparing environmental documentation to meet the requirements of the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code).
(e)Any and all other items entering directly into the cost of the dam or reservoir.