§ 12928.1
54 words·~1 min read·
/ca/water-code/12928-1A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The department shall give priority to projects of agencies located in overdrafted groundwater basins and those projects of critical need, to projects whose feasibility studies show the greatest economic justification and the greatest engineering and hydrogeologic feasibility as determined by the department, and to projects located in areas which have existing water management programs.