Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Water Code

§ 1250.5

149 words·~1 min read·/ca/water-code/1250-5

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

The board shall consider and act upon all applications for permits to appropriate water which propose, as a primary purpose of the application, the development of small hydroelectric energy facilities at an existing dam, canal, or conduit, up to and including 30 megawatts, or the development of any other hydroelectric facility with a generating capacity of five megawatts or less, within one year from the date a complete application and an instream beneficial use assessment have been filed with the board, except that the assessment need not be filed if the streamflow regime will not be changed, and except that final board action may be continued for a reasonable time not to exceed one year upon the request of the applicant or upon a finding by the board that the additional time is necessary to determine
(1)if unappropriated water is available or
(2)the effect upon instream uses.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.