§ 11565
34 words·~1 min read·
/ca/water-code/11565A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The construction of all or any part of the San Joaquin Pumping System may be deferred until such time as the department determines that the construction of it is required and is economically justified.