Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Water Code

§ 10731

303 words·~1 min read·/ca/water-code/10731

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)Following an investigation pursuant to Section 10725.4, the governing body may make a determination fixing the amount of groundwater production from the groundwater extraction facility at an amount not to exceed the maximum production capacity of the facility for purposes of levying a groundwater charge. If a water-measuring device is permanently attached to the groundwater extraction facility, the record of production as disclosed by the water-measuring device shall be presumed to be accurate unless the contrary is established by the groundwater sustainability agency after investigation.
(b)After the governing body makes a determination fixing the amount of groundwater production pursuant to subdivision (a), a written notice of the determination shall be mailed to the owner or operator of the groundwater extraction facility at the address as shown by the groundwater sustainability agency’s records. A determination made by the governing body shall be conclusive on the owner or operator and the groundwater charges, based on the determination together with any interest and penalties, shall be payable immediately unless within 20 days after the mailing of the notice the owner or operator files with the governing body a written protest setting forth the ground for protesting the amount of production or the groundwater charges, interest, and penalties. If a protest is filed pursuant to this subdivision, the governing body shall hold a hearing to determine the total amount of the groundwater production and the groundwater charges, interest, and penalties. Notice of the hearing shall be mailed to each protestant at least 20 days before the date fixed for the hearing. Notice of the determination of the governing body hearing shall be mailed to each protestant. The owner or operator shall have 20 days from the date of mailing of the determination to pay the groundwater charges, interest, and penalties determined by the governing body.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.