Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Water Code

§ 106.7

278 words·~1 min read·/ca/water-code/106-7

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)It is hereby declared to be the established policy of this state to support and encourage the development of environmentally compatible small hydroelectric projects as a renewable energy source, provided that the projects do not result in surface disturbances within the following sensitive areas:
(1)Any component of the California Wild and Scenic Rivers System or the National Wild and Scenic Rivers System.
(2)Any river designated for study pursuant to Section 5(a) of the National Wild and Scenic River Act (16 U.S.C. 1276(a)). This paragraph shall not apply to any river which, upon the completion of the study, is not included in the National Wild and Scenic Rivers System.
(3)Any state or federally designated wilderness area.
(4)Any areas designated as a “Critical Condor Habitat” by the United States Fish and Wildlife Service.
(b)State agencies shall not approve small hydroelectric development within the sensitive areas specified in subdivision (a).
(c)Significant adverse impacts associated with small hydroelectric projects shall be identified by those agencies responsible for the preparation of the environmental impact document.
(d)Emphasis on the development of small hydroelectric power generating facilities which are “qualifying small power production facilities” under Section 210 of the Public Utilities Regulatory Policies Act of 1978, shall be on existing dams, diversions, and canals with a sufficient drop so that power may be efficiently generated without significant environmental effects.
(e)For hydroelectric power generating facilities, the applicant shall demonstrate that project revenues will exceed project costs, including the cost of mitigation measures over the life of the project.
(f)Subdivisions
(d)and
(e)do not apply to projects with a nameplate capacity of less than 100 kilowatts.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.