Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Streets and Highways Code

§ 26130

135 words·~1 min read·/ca/streets-and-highways-code/26130

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Before the construction of any boulevard and before the calling of any election for the issuance of bonds, the commission shall employ one or more engineers who shall make all necessary surveys, prepare maps showing the location, cross-section and profile of the proposed boulevard. The engineer shall also prepare specifications for the construction of the boulevard and estimates of the cost of construction and of acquiring rights of way.
These surveys, maps, specifications and estimates shall, upon approval by the commission, be formally adopted by order entered upon its minutes and filed with its secretary and when so adopted shall constitute the plan of the district for the proposed boulevard. The commission may, at its option, direct the county surveyor, or county engineer, as the case may be, to do any of the engineering work.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.