§ 25231
49 words·~1 min read·
/ca/streets-and-highways-code/25231A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
In proceeding with a project, or unit thereof, the board of directors shall have all necessary final surveys, plans, specifications and detailed drawings prepared by the district engineer. Upon completion thereof the surveys, plans, specifications and detailed drawings shall be filed with and approved by the board of directors.