Code · California · Public Utilities Code

§ 2827.8

310 words·~1 min read·/ca/public-utilities-code/2827-8

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Notwithstanding any other provisions of this article, the following provisions apply to an eligible customer-generator utilizing wind energy co-metering with a capacity of more than 50 kilowatts, but not exceeding one megawatt, unless approved by the electric service provider.
(a)The eligible customer-generator shall be required to utilize a meter, or multiple meters, capable of separately measuring electricity flow in both directions. Nothing in this section precludes the use of advanced metering infrastructure devices. All meters shall provide “time-of-use” measurements of electricity flow, and the customer shall take service on a time-of-use rate schedule. If the existing meter of the eligible customer-generator is not a time-of-use meter or is not capable of measuring total flow of energy in both directions, the eligible customer-generator is responsible for all expenses involved in purchasing and installing a meter that is both time-of-use and able to measure total electricity flow in both directions. This subdivision shall not restrict the ability of an eligible customer-generator to utilize any economic incentives provided by a government agency or the electric service provider to reduce its costs for purchasing and installing a time-of-use meter.
(b)The consumption of electricity from the electric service provider for wind energy co-metering by an eligible customer-generator shall be priced in accordance with the standard rate charged to the eligible customer-generator in accordance with the rate structure to which the customer would be assigned if the customer did not use an eligible wind electrical generating facility. The generation of electricity provided to the electric service provider shall result in a credit to the eligible customer-generator and shall be priced in accordance with the generation component, excluding surcharges to cover the purchase of power by the Department of Water Resources, established under the applicable structure to which the customer would be assigned if the customer did not use an eligible wind electrical generating facility.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.