Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Public Utilities Code

§ 2794

340 words·~2 min read·/ca/public-utilities-code/2794

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

(a)A gas or electric system shall be considered acceptable for transfer if it is in compliance with the following criteria:
(1)It is capable of providing the end users a safe and reliable source of gas or electric service.
(2)It meets the commission’s general orders, is compatible, and, in the case of new construction, meets the gas or electric corporation’s design and construction standards insofar as they are related to safety and reliability. The parties may waive these requirements by mutual agreement and, where necessary, with commission approval. The deviations as are agreed upon may be reflected in the purchase price.
(3)It is capable of serving the customary expected load in the park or community determined in accordance with a site-specific study, studies of comparable parks or communities, industry standards, and the gas or electric corporation’s rules as approved by the commission.
(b)As used in this section, “customary expected load” means the anticipated level of service demanded by the dwelling units in the park or community. The park or community owner shall not be responsible for betterments or improvements to the gas or electric corporation’s distribution system facilities or operations that do not benefit the park or community.
(c)Satisfaction of the criteria shall not require any particular system architecture or replacement of used and useful equipment, plant, or facilities, except as needed to comply with subdivision (a). Equipment, facilities, or plant that are part of the existing gas or electric system shall be considered compatible unless their presence in the system would cause substantial increase in the frequency or duration of outages in the case of failure or emergency, or they have no remaining useful life. Pursuant to subdivision
(c)of Section 2793, equipment, facilities, or plant that require special training for the gas or electric corporation’s employees, or require the gas or electric corporation to maintain inventories of nonstandard equipment may be considered compatible, but their presence may be reflected in the appraised value or the cost imposed on the park or community owner.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.