(a)Notwithstanding any other provision of law, no notice of intention is required, and the commission shall issue its final decision on the application, as specified in Section 25523, within 12 months after the filing of the application for certification of the powerplant and related facility or facilities, or at any later time as is mutually agreed by the commission and the applicant, for any of the following:
(1)A thermal powerplant which will employ cogeneration technology, a thermal powerplant that will employ natural gas-fired technology, or a solar thermal powerplant.
(2)A modification of an existing facility.
(3)A thermal powerplant which it is only technologically or economically feasible to site at or near the energy source.
(4)A thermal powerplant with a generating capacity of up to 100 megawatts.
(5)A thermal powerplant designed to develop or demonstrate technologies which have not previously been built or operated on a commercial scale. Such a research, development, or commercial demonstration project may include, but is not limited to, the use of renewable or alternative fuels, improvements in energy conversion efficiency, or the use of advanced pollution control systems. Such a facility may not exceed 300 megawatts unless the commission, by regulation, authorizes a greater capacity. Section 25524 does not apply to such a powerplant and related facility or facilities.
(b)Projects exempted from the notice of intention requirement pursuant to paragraph (1), (4), or
(5)of subdivision
(a)shall include, in the application for certification, a discussion of the applicant’s site selection criteria, any alternative sites that the applicant considered for the project, and the reasons why the applicant chose the proposed site. That discussion shall not be required for cogeneration projects at existing industrial sites. The commission may also accept an application for a noncogeneration project at an existing industrial site without requiring a discussion of site alternatives if the commission finds that the project has a strong relationship to the existing industrial site and that it is therefore reasonable not to analyze alternative sites for the project.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.