(a)The Construction Manager/General Contractor method provided by this article may be used by the department, but is not limited to, when it is anticipated that the method will reduce project costs or expedite project completion in a manner that is not achievable through the design-bid-build method. Notwithstanding any other law, for projects utilizing the Construction Manager/General Contractor method provided by this article, the department shall advertise, award, and administer the Construction Manager/General Contractor contract.
(b)On all projects delivered by the department utilizing the Construction Manager/General Contractor method provided by this article, the department shall use department employees or consultants under contract with the department to perform all project design and engineering services related to design required for Construction Manager/General Contractor project delivery consistent with Article XXII of the California Constitution. On all projects delivered by the department, the department shall use department employees or consultants under contract with the department to perform all construction inspection services required for Construction Manager/General Contractor project delivery consistent with Article XXII of the California Constitution.
(c)The Construction Manager/General Contractor method referenced in this article shall not include the authority to perform construction inspection services for water resources projects authorized by this article, except as provided by Section 148 of the Water Code.
(d)Notwithstanding any other provision of this article, the department shall not utilize this method of procurement for the design or construction of through-Delta conveyance facilities of the Sacramento-San Joaquin Delta.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.