§ 7102
52 words·~1 min read·
/ca/labor-code/7102A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Every building which is of reinforced concrete construction, with reinforced concrete floors, shall have the floor filled in, either with forms or concrete, on each floor before the commencement of work upon the walls of the second floor above or the commencement of work upon the floor of the next floor above.