Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · California · Health and Safety Code

§ 39915

277 words·~1 min read·/ca/health-and-safety-code/39915

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

On or before July 1, 2002, the state board, in consultation with air quality management districts, air pollution control districts, and the Independent System Operator, shall establish a schedule for the retrofit of electric generation facilities pursuant to retrofit criteria and procedures established under the federal Clean Air Act (42 U.S.C. Section 7401 et seq.) or this division. The schedule shall require completion of any mandated retrofits by December 31, 2004, or such later date as the state board, in consultation with the Independent System Operator, air pollution control districts, air quality management districts, and the owners and operators of electrical generating facilities determines is necessary to maintain electric system reliability.
Nothing in this section is intended to require the retrofit of a generation facility that could not be required to be retrofitted by an air quality management district or air pollution control district under the law in effect on the effective date of the act adding this chapter during the 2001-02 First Extraordinary Session. The state board shall suspend the deadline for the completion of a retrofit of an electrical generation unit scheduled pursuant to this section if it determines all of the following:
(a)The owner of the generation unit proposes to replace or repower the generation unit in a manner that complies with all applicable laws and regulations.
(b)The owner has filed the necessary applications for permits for such replacement or repower prior to the suspension of the deadline for the completion of the required retrofits.
(c)The owner is diligently proceeding with the replacement or repower of the unit and the state board determines that the replacement or repower will be completed.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.