§ 926
59 words·~1 min read·
/ca/civil-code/926A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The builder may not obtain a release or waiver of any kind in exchange for the repair work mandated by this chapter. At the conclusion of the repair, the claimant may proceed with filing an action for violation of the applicable standard or for a claim of inadequate repair, or both, including all applicable damages available under Section 944.