Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · BILL · 119th Congress · H.R. 3898 (Referred in Senate) — To amend the Federal Water Pollution Control Act to make targeted reforms with respect to waters of the United States... · Sec. 13

Sec. 13. Nationwide permitting improvement

676 words·~3 min read·/bill/119/hr/3898/rfs/section-13·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Section 404(e) of the Federal Water Pollution Control Act ( 33 U.S.C. 1344 ) is amended— by striking (e)(1) In carrying and inserting the following: In carrying ; in paragraph (2)— by striking
(2)No general and inserting the following: No general ; and by striking five years and inserting ten years ; and by adding at the end the following: In determining the environmental effects of an activity under paragraph
(1)or (2), the Secretary— shall consider only the effects of any discharge of dredged or fill material resulting from such activity; shall consider any effects of a discharge of dredged or fill material into less than 3 acres of navigable waters to be a minimal adverse environmental effect; and may consider any effects of a discharge of dredged or fill material into 3 acres or more of navigable waters to be a minimal adverse environmental effect. Notwithstanding any other provision of this section, the Secretary shall maintain general permits on a nationwide basis for— linear infrastructure projects that result in a discharge of dredged or fill material into less than 3 acres of navigable waters for each single and complete project; and linear pipeline projects that do not result in the loss of navigable waters in an amount that is greater than 0.5 acres for each single and complete project. In this paragraph: The term linear infrastructure project means a project to carry out any activity required for the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transmission from a point of origin to a terminal point of communications or electricity, or for the transportation from a point of origin to a terminal point of people, water, or wastewater. The term linear pipeline project means a project to carry out any activity required for the construction, expansion, maintenance, modification, or removal of infrastructure and associated facilities for the transportation from a point of origin to a terminal point of carbon dioxide, fuel, or hydrocarbons, in the form of a liquid, liquescent, gaseous, or slurry substance or supercritical fluid, including oil and gas pipeline facilities. The term single and complete project has the meaning given that term in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this paragraph). In determining whether to reissue a general permit issued under this subsection on a nationwide basis— no consultation with an applicable State pursuant to section 6(a) of the Endangered Species Act of 1973 ( 16 U.S.C. 1535(a) ) is required; no consultation with a Federal agency pursuant to section 7(a)(2) of such Act ( 16 U.S.C. 1536(a)(2) ) is required; and the requirements of section 102(2)(C) of the National Environmental Policy Act of 1969 ( 42 U.S.C. 4332(2)(C) ) shall be satisfied by preparing an environmental assessment with respect to such general permit. . The Secretary of the Army, acting through the Chief of Engineers, shall expeditiously revise the regulations applicable to carrying out section 404(e) of the Federal Water Pollution Control Act ( 33 U.S.C. 1344 ) in order to streamline the processes for issuing general permits under such section to promote efficient and consistent implementation of such section. In carrying out section 404(e) of the Federal Water Pollution Control Act ( 33 U.S.C. 1344 ), including in revising regulations under subsection
(b)of this section, the Secretary of the Army, acting through the Chief of Engineers, may not finalize or implement any modification to— general condition 15 (relating to single and complete projects), as included in the final rule titled Reissuance and Modification of Nationwide Permits and published on January 13, 2021, by the Department of the Army, Corps of Engineers (86 Fed. Reg. 2868); the definition of the term single and complete linear project , as included in such final rule (86 Fed. Reg. 2877); or the definition of the term single and complete project , as included in section 330.2 of title 33, Code of Federal Regulations (as in effect on the date of enactment of this Act).
Connectionstraces to 4
2 references not yet in our index
  • 86 FR 2868
  • 86 FR 2877
Citation graph
cites case law
Sec. 13
Nationwide permitting improvement
Fed. Reg.86 FR 2868
Fed. Reg.86 FR 2877
Cites 6Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.