Sec. 325. Larose to Golden Meadow, Louisiana
247 words·~1 min read·
/bill/118/hr/8812/rh/section-325A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than June 30, 2025, the Secretary shall complete a study of the following relating to the covered project: Any project modifications undertaken by the non-Federal interest for the covered project since 2005 not constructed in accordance with section 14 of the Act of March 3, 1899 ( 33 U.S.C. 408 ). Current elevations required for the covered project to meet the 100-year level of risk reduction. Whether project modifications undertaken by the non-Federal interest for the covered project since 2005 were injurious to the covered project or the public.
Any deviations from design guidelines acceptable for the covered project. Improvements needed for the covered project to address any deficiencies according to current design guidelines of the Corps of Engineers district in which the covered project is located. A re-evaluation of project economics. Not later than 90 days after completing the study under paragraph (1), the Secretary shall submit to Congress a report that includes— the results of the study; a recommendation for a pathway into a systemwide improvement plan created pursuant to section 5(c)(2) of the Act of August 18, 1941 ( 33 U.S.C. 701n(c) ) (as amended by this Act); and recommendations for improvement to the covered project to address any deficiencies.
In this section, the term covered project means the Larose to Golden Meadow project, Louisiana, authorized by the Flood Control Act of 1965 as the Grand Isle and vicinity project. There is authorized to be appropriated to carry out this section $3,000,000.
Connectionstraces to 2
Citation graph
cites case law