Code · BILL · 118th Congress · H.R. 6747 (Introduced in House) — To speed up the deployment of electricity transmission and clean energy, with proper input from affected communities,... · Sec. 103

Sec. 103. Allocation of costs of interregional electric transmission facilities

312 words·~1 min read·/bill/118/hr/6747/ih/section-103·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

Part II of the Federal Power Act ( 16 U.S.C. 824 et seq. ) is further amended by adding at the end the following: Any transmitting utility that owns, controls, or operates a transmission facility of national significance, or proposes to own, control, or operate a transmission facility of national significance, may file a tariff with the Commission in accordance with section 205 allocating the costs of constructing, modifying, and operating such transmission facility of national significance in accordance with paragraph (2). The Commission shall require that any tariff described in paragraph
(1)allocate the cost to construct, modify, and operate a transmission facility of national significance to customers within the applicable transmission planning region or regions in a manner that is roughly commensurate with the reasonably anticipated transmission benefits. In this section, the term transmission facility of national significance means— an interstate electric power transmission line (and any facilities necessary for the operation of such electric power transmission line)— that has a transmission capacity of not less than 1,000 megawatts; and the construction of which is completed on or after the date of enactment of this section; an electric power transmission line (and any facilities necessary for the operation of such electric power transmission line) that is located offshore, the construction of which is completed on or after the date of enactment of this section; or an expansion of, or upgrade to, an interstate electric power transmission line (and any facilities necessary for the operation of such electric power transmission line) that— increases the transmission capacity of such electric power transmission line by at least 500 megawatts; and the construction of which is completed on or after the date of enactment of this section. This section does not affect the authority of the Commission to approve the allocation of costs of transmission facilities other than transmission facilities of national significance. .
Connectionstraces to 1
Citation graph
cites case law
Sec. 103
Allocation of costs of interregional electric transmission facilities
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.