Sec. 359. Modifications to military aviation and installation assurance clearinghouse for review of mission obstructions
477 words·~2 min read·
/bill/118/hr/2670/eas/section-359·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Section 183a of title 10, United States Code, is amended— in subsection (d)(2)— in subparagraph (B), by inserting or any active intercontinental ballistic missile launch facility or control center after military training routes ; and in subparagraph (E), by striking or a Deputy Under Secretary of Defense and inserting a Deputy Under Secretary of Defense, or, in the case of a geographic area of concern related to an active intercontinental ballistic missile launch facility or control center, the Assistant Secretary of Defense for Energy, Installations, and Environment ; and in subsection (e)(1)— in the first sentence— by striking The Secretary and inserting
(A)The Secretary ; and by inserting or antenna structure project after energy project ; in the second sentence, by striking The Secretary of Defense's finding of unacceptable risk to national security and inserting the following: Any finding of unacceptable risk to national security by the Secretary of Defense under this paragraph ; and by inserting after subparagraph (A), as designated by subparagraph (A)(i) of this paragraph, the following new subparagraph: In the case of any energy project or antenna structure project with proposed structures more than 200 feet above ground level located within two nautical miles of an active intercontinental ballistic missile launch facility or control center, the Secretary of Defense shall issue a finding of unacceptable risk to national security for such project if the mitigation actions identified pursuant to this section do not include removal of all such proposed structures from such project after receiving notice of presumed risk from the Clearinghouse under subsection (c)(2). Clause
(i)does not apply to structures approved before the date of the enactment of the National Defense Authorization Act for Fiscal Year 2024 or to structures that are re-powered with updated technology in the same location as previously approved structures. . Such section is further amended— by inserting or antenna structure projects after energy projects each place it appears; and by inserting or antenna structure project after energy project each place it appears (except for subsections (e)(1) and (h)(2)). Section 183a(h) of such title is amended— by redesignating paragraphs
(2)through
(9)as paragraphs
(3)through (10), respectively; and by inserting after paragraph
(1)the following new paragraph: The term antenna structure project — means a project to construct a structure located within two nautical miles of any intercontinental ballistic missile launch facility or control center that is constructed or used to transmit radio energy or that is constructed or used for the primary purpose of supporting antennas to transmit or receive radio energy (or both), and any antennas and other appurtenances mounted on the structure, from the time construction of the supporting structure begins until such time as the supporting structure is dismantled; and does not include any project in support of or required by an intercontinental ballistic missile launch facility or control center. .