Sec. 7. Strategic production response plan
211 words·~1 min read·
/bill/117/s/3752/is/section-7A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Section 161 of the Energy Policy and Conservation Act ( 42 U.S.C. 6241 ) is amended by adding at the end the following: Except in the case of a severe energy supply interruption described in subsection (d), the Secretary may not execute the first drawdown of petroleum products in the Reserve after the date of enactment of this subsection, whether through sale, exchange, or loan, until the Secretary has developed a plan to increase the percentage of Federal land (including submerged land of the outer Continental Shelf) under the jurisdiction of the Secretary of Agriculture, the Secretary of Energy, the Secretary of the Interior, and the Secretary of Defense leased for oil and gas production by the same percentage as the percentage of petroleum in the Strategic Petroleum Reserve that is to be drawn down in that first drawdown and subsequent drawdowns, subject to the limitation described in paragraph (2).
The plan developed under paragraph
(1)shall not provide for a total increase in the percentage of Federal land described in paragraph
(1)leased for oil and gas production in excess of 10 percent. The Secretary shall prepare the plan under paragraph
(1)in consultation with the Secretary of Agriculture, the Secretary of the Interior, and the Secretary of Defense. .
Connectionstraces to 1
Traces to 1 document
Citation graph
cites case law
Sec. 7
Strategic production response plan
Cites 1Cited by 0 across 0 sources