Sec. 3. Keystone XL authorization
161 words·~1 min read·
/bill/117/s/3752/is/section-3A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
TransCanada Keystone Pipeline, L.P., may construct, connect, operate, and maintain the pipeline facilities at the international border of the United States and Canada at Phillips County, Montana, for the import of oil from Canada to the United States, as described in the Presidential Permit of March 29, 2019 (84 Fed. Reg. 13101 (April 3, 2019)). No Presidential permit (or similar permit) under Executive Order 13867 ( 3 U.S.C. 301 note; relating to the issuance of permits with respect to facilities and land transportation crossings at the international boundaries of the United States), Executive Order 12038 ( 42 U.S.C. 7151 note; relating to the transfer of certain functions to the Secretary of Energy), Executive Order 10485 ( 15 U.S.C. 717b note; relating to the performance of functions respecting electric power and natural gas facilities located on United States borders), or any other Executive order shall be required for the construction, connection, operation, or maintenance of the pipeline facilities described in subsection (a).
Connectionstraces to 6
1 reference not yet in our index
- 84 FR 13101
Citation graph
cites case law
Sec. 3
Keystone XL authorization
Fed. Reg.84 FR 13101
Cites 7Cited by 0 across 0 sources