Section 216(a) of the Federal Power Act ( 16 U.S.C. 824p(a) ) is amended— in paragraph (1)— by inserting and Indian Tribes after affected States ; and by inserting capacity constraints and before congestion ; in paragraph (2)— by striking After and inserting Not less frequently than once every 3 years, the Secretary, after ; and by striking affected States and all that follows through the period at the end and inserting the following: “affected States and Indian Tribes), shall issue a report, based on the study under paragraph
(1)or other information relating to electric transmission capacity constraints and congestion, which may designate as a national interest electric transmission corridor any geographic area that— is experiencing electric energy transmission capacity constraints or congestion that adversely affects consumers; or is expected to experience such energy transmission capacity constraints or congestion. ; in paragraph (3)— by striking The Secretary shall conduct the study and issue the report in consultation and inserting Not less frequently than once every 3 years, the Secretary, in conducting the study under paragraph
(1)and issuing the report under paragraph (2), shall consult ; and in paragraph (4)— in subparagraph (C), by inserting or energy security after independence ; in subparagraph (D), by striking and at the end; in subparagraph (E), by striking the period at the end and inserting a semicolon; and by adding at the end the following: the designation would enhance the ability of facilities that generate or transmit firm or intermittent energy to connect to the electric grid; the designation— maximizes existing rights-of-way; and avoids and minimizes, to the maximum extent practicable, and offsets to the extent appropriate and practicable, sensitive environmental areas and cultural heritage sites; and the designation would result in a reduction in the cost to purchase electric energy for consumers. . Section 216(b) of the Federal Power Act ( 16 U.S.C. 824p(b) ) is amended— in paragraph (1)— in subparagraph (A)(ii), by inserting or interregional benefits after interstate benefits ; and by striking subparagraph
(C)and inserting the following: a State commission or other entity that has authority to approve the siting of the facilities— has not made a determination on an application seeking approval pursuant to applicable law by the date that is 1 year after the later of— the date on which the application was filed; and the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a); has conditioned its approval in such a manner that the proposed construction or modification will not significantly reduce transmission capacity constraints or congestion in interstate commerce or is not economically feasible; or has denied an application seeking approval pursuant to applicable law; . Section 216(e)(1) of the Federal Power Act ( 16 U.S.C. 824p(e)(1) ) is amended by striking modify the transmission facilities, the and inserting modify, and operate and maintain, the transmission facilities and, in the determination of the Commission, the permit holder has made good faith efforts to engage with landowners and other stakeholders early in the applicable permitting process, the . Section 216(i) of the Federal Power Act ( 16 U.S.C. 824p(i) ) is amended— in paragraph (2), by striking may and inserting shall ; and in paragraph (4), by striking the members and all that follows through the period at the end and inserting the following: “the Secretary determines that the members of the compact are in disagreement after the later of— the date that is 1 year after the date on which the relevant application for the facility was filed; and the date that is 1 year after the date on which the relevant national interest electric transmission corridor was designated by the Secretary under subsection (a). .
Connectionstraces to 1
Citation graph
cites case law
Sec. 1005
Siting of interstate electric transmission facilities
Cites 1Cited by 0 across 0 sources
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.