Sec. 8201. Authorization of proposed feasibility studies
1,997 words·~9 min read·
/bill/117/hr/7776/eah/section-8201·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The Secretary is authorized to conduct a feasibility study for the following projects for water resources development and conservation and other purposes, as identified in the reports titled Report to Congress on Future Water Resources Development submitted to Congress pursuant to section 7001 of the Water Resources Reform and Development Act of 2014 ( 33 U.S.C. 2282d ) or otherwise reviewed by Congress: Project for flood risk management, Dudleyville, Arizona. Project for flood risk management, McMicken Dam, Arizona.
Project for flood risk management, Conn Creek Dam, California. Project for hurricane and storm damage risk reduction, including sea level rise, and shoreline stabilization, City of Huntington Beach, California. Project for navigation, Federal Channel of Napa River, California. Project for ecosystem restoration, City of Petaluma, California. Project for ecosystem restoration and flood risk management, City of Rialto and vicinity, California. Project for hurricane and storm damage risk reduction, including sea level rise, and ecosystem restoration, North Richmond, California.
Project for hurricane and storm damage risk reduction and flood risk management, Stratford, Connecticut. Project for flood risk management and ecosystem restoration, Thatchbed Island, Essex, Connecticut. Project for flood risk management, Woodbridge, Connecticut. Project for flood risk management, Federal Triangle Area, Washington, District of Columbia, including construction of improvements to interior drainage. Project for recreational access, including enclosed swimming areas, Potomac and Anacostia Rivers, District of Columbia.
Project for water supply, including the identification of a secondary water source and additional water storage capability for the Washington Metropolitan Area, Washington, District of Columbia, Maryland, and Virginia. Project for whole island hurricane and storm damage risk reduction, Town of Longboat Key, Florida. Project for ecosystem restoration, Lake Runnymede, Florida. Project for flood risk management and hurricane and storm damage risk reduction, including the use of natural features and nature-based features for protection and recreation, Tampa Back Bay, Florida.
Project for hurricane and storm damage risk reduction, Port Tampa Bay, Florida, including McKay Bay. Project for ecosystem restoration and flood risk management, Lake Tohopekaliga, Florida. Project for flood risk management, City of Albany, Georgia. Project for flood risk management, City of East Point, Georgia. Project for ecosystem restoration and coastal storm risk management, Cumberland Island and Sea Island, Georgia. Project for flood risk management and ecosystem restoration, Flint River Basin Headwaters, Clayton County, Georgia.
Project for flood and coastal storm risk management, County of Hawai‘i, Hawaii. Project for coastal storm risk management, County of Maui, Hawaii. Project for ecosystem restoration and hurricane and storm damage risk reduction, Waikīkī, Hawaii. Project for flood risk management, Wailupe Stream watershed, Hawaii. Project for flood risk management, including riverbank stabilization, Columbus, Kentucky. Project for navigation, Cumberland River, Kentucky. Project for flood risk management and water supply, Jenkins, Kentucky.
Project for flood risk management on the Kentucky River and its tributaries and watersheds in Breathitt, Clay, Estill, Harlan, Lee, Leslie, Letcher, Owsley, Perry, and Wolfe Counties, Kentucky. Project for ecosystem restoration, flood risk management, and recreation, Newport, Kentucky. Project for flood risk management, Ellicott City and Howard County, Maryland. Project for ecosystem restoration, flood risk management, and water supply, Assawompset Pond Complex, Massachusetts.
Project for flood risk management and ecosystem restoration, Charles River, Massachusetts. Project for flood risk management and ecosystem restoration, including bank stabilization, City of Chelsea, Massachusetts. Project for streambank erosion, Connecticut River, Massachusetts, Vermont, and New Hampshire. Project for flood risk management and ecosystem restoration, Deerfield River, Massachusetts. Project for ecosystem restoration and flood risk management, Ten Mile River, North Attleborough, Massachusetts.
Project for flood risk management and hurricane and storm damage risk reduction, Hull, Massachusetts. Project for flood risk management and marsh ecosystem restoration, City of Revere, Massachusetts. Project for flood risk management, Lower East Side, Detroit, Michigan. Project for dam removal, by carrying out a disposition study under section 216 of the Flood Control Act of 1970 ( 33 U.S.C. 549a ), Elijah Root Dam, Michigan. Project for ecosystem restoration and flood risk management, Grosse Pointe Shores and Grosse Pointe Farms, Michigan.
Project for flood risk management, Southeast Michigan. Project for flood risk management and ecosystem restoration, Tittabawassee River, Chippewa River, Pine River, and Tobacco River, Michigan. Project for ecosystem restoration and flood risk management, Wilkinson, Adams, Warren, Claiborne, Franklin, Amite, and Jefferson Counties, Mississippi. Project for flood risk management, Bellevue, Nebraska, including the placement of a pump station near Offutt Ditch. Project for flood risk management, including levee improvement, Papillion Creek, Nebraska.
Project for flood risk management, Sarpy County, Nebraska. Project for tidal and riverine flood risk management, Camden and Gloucester Counties, New Jersey. Project for flood risk management, Edgewater, New Jersey. Project for navigation and for beneficial use of dredged materials for hurricane and storm damage risk reduction and ecosystem restoration, Maurice River, New Jersey. Project for inland flood risk management in Hudson, Essex, Union, Bergen, Hunterdon, Morris, Somerset, Warren, Passaic, and Sussex Counties, New Jersey.
Project for flood risk management, including channel improvements, and other related water resource needs related to Riser Ditch in the communities of South Hackensack, Hasbrouck Heights, Little Ferry, Teterboro, and Moonachie, New Jersey. Project for flood risk management and ecosystem restoration, including bank stabilization, Rockaway River, New Jersey. Project for flood risk management, Tenakill Brook, New Jersey. Project for flood risk management along the Peckman River Basin in the townships of Verona (and surrounding area), Cedar Grove, and West Caldwell, New Jersey.
Project for flood risk management, Morris County, New Jersey. Project for water supply, Lake Farmington Dam, New Mexico. Project for dam safety improvements and flood risk management, McClure Dam, City of Santa Fe, New Mexico. Project for flood risk management, coastal storm risk management, navigation, ecosystem restoration, and water supply, Blind Brook, New York. Project for flood risk management and hurricane and storm damage risk reduction, Brooklyn Navy Yard, New York. Project for navigation, Connetquot River and Green Creek, Suffolk County, New York.
Project for flood risk management and ecosystem restoration, Hutchinson River, New York. Project for flood risk management, navigation, and environmental restoration, Mohawk River Basin, New York. Project for ecosystem restoration, Newtown Creek, New York. Project for flood risk management and hurricane and storm risk reduction, Oyster Bay, New York, in the vicinity of John J. Burns Park, Massapequa, New York, including the replacement and reconstruction of the existing bulkhead system.
Project for flood risk management and hurricane and storm risk reduction, Oyster Bay, New York, in the vicinity of the Joseph J. Saladino Memorial Marina, Massapequa, New York, including the replacement and reconstruction of the existing bulkhead system. Project for flood risk management and ecosystem restoration to address areas in the City of Yonkers and the Village of Hastings-on-Hudson within the 100-year flood zone, Saw Mill River, New York. Project for flood and coastal storm risk management, navigation, and ecosystem restoration, South Shore of Long Island, New York.
Project for ecosystem restoration, Upper East River and Flushing Bay, New York. Project for flood and coastal storm risk management, Cape Fear River Basin, North Carolina. Project for navigation, Oregon Inlet, North Carolina. Project for dam safety improvements and rehabilitation, Mineral Ridge Dam, Ohio. Project for ecosystem restoration, Mill Creek Levee and Walla Walla River, Oregon. Project for ecosystem restoration and flood risk management, Brodhead Creek Watershed, Pennsylvania.
Project for flood risk management, Chartiers Creek Watershed, Pennsylvania. Project for flood risk management, Coplay Creek, Pennsylvania. Project for ecosystem restoration and flood risk management, Berkeley County, South Carolina. Project for flood risk management, City of Watertown and vicinity, South Dakota. Project for flood risk management for economically disadvantaged communities, as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 ( 33 U.S.C. 2201 note), along the United States-Mexico border, El Paso County, Texas.
Project for navigation, Gulf Intracoastal Waterway-Channel to Palacios, Texas. Project for flood risk management and ecosystem restoration, the Resacas, Hidalgo and Cameron Counties, Texas. Project for ecosystem restoration and flood risk management, Sikes Lake, Texas. Project for flood risk management for economically disadvantaged communities, as defined by the Secretary under section 160 of the Water Resources Development Act of 2020 ( 33 U.S.C. 2201 note), along the United States-Mexico border in Webb, Zapata, and Starr Counties, Texas.
Project for flood risk management, Lower Clear Creek and Dickinson Bayou, Texas. Project for ecosystem restoration and water supply, Great Salt Lake, Utah. Project for ecosystem restoration, hurricane and storm damage risk reduction, and navigation, Cedar Island, Virginia. Project for ecosystem restoration, City of Shoreline, Washington. Project for water supply, City of North Bend, Washington. Project for ecosystem restoration, Taneum Creek, Washington. Project for flood risk management, Huntington, West Virginia.
Project for flood risk management and water supply, Fox-Wolf Basin, Wisconsin. The Secretary is authorized to conduct a feasibility study for the following project modifications: Modifications to the project for flood protection and major drainage improvement in the Saint Francis River Basin, Missouri and Arkansas, authorized by section 204 of the Flood Control Act of 1950 (64 Stat. 172), to provide flood risk management for the tributaries and drainage of Straight Slough, Craighead, Poinsett, and Cross Counties, Arkansas.
Modifications to the project for ecosystem restoration and water storage, Shingle Creek and Kissimmee River, Florida, authorized by section 201(a)(5) of the Water Resources Development Act of 2020 (134 Stat. 2670), for flood risk management. Modifications to the project for navigation, Jacksonville Harbor, Florida, authorized by section 7002 of the Water Resources Reform and Development Act of 2014 (128 Stat. 1364), for outer channel improvements. Modifications to the project for navigation, Savannah Harbor Expansion Project, Georgia, authorized by section 7002(1) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1364; 132 Stat. 3839), without evaluation of additional deepening.
Modifications to the project for navigation, Honolulu Harbor, Hawaii, for navigation improvements and coastal storm risk management, authorized by the first section of the Act of March 3, 1905 (chapter 1482, 33 Stat. 1146). Modifications to the project for flood risk management, Cedar River, Cedar Rapids, Iowa, authorized by section 7002(2) of the Water Resources Reform and Development Act of 2014 (128 Stat. 1366), consistent with the City of Cedar Rapids, Iowa, Cedar River Flood Control System Master Plan.
Modifications to the project for navigation, South Haven Harbor, Michigan, for turning basin improvements, authorized by the first section of the Act of August 11, 1888 (chapter 860, 25 Stat. 406). Modifications to the project for navigation, Salem River, Salem County, New Jersey, authorized by section 1 of the Act of March 2, 1907 (chapter 2509, 34 Stat. 1080), to increase the authorized depth. Modifications to the project for navigation, Port of Ogdensburg, New York, including deepening, authorized by the first section of the Act of June 25, 1910 (chapter 382, 36 Stat. 635).
Modifications to the project for navigation, Rollinson Channel and channel from Hatteras Inlet to Hatteras, North Carolina, authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1174), to incorporate the ocean bar. Modifications to the Hiram M. Chittenden Locks (also known as Ballard Locks), Lake Washington Ship Canal, Washington, authorized by the Act of June 25, 1910 (chapter 382, 36 Stat. 666), for the construction of fish ladder improvements, including efforts to address elevated temperature and low dissolved oxygen levels in the Canal.
Modifications to the Huntington Local Protection Project, Huntington, West Virginia. The study authorized by subsection (a)(27) shall be considered a resumption and a continuation of the general reevaluation initiated on December 30, 2003, pursuant to section 209 of the Flood Control Act (76 Stat. 1197). The studies authorized by paragraphs
(48)and
(49)of subsection
(a)shall be considered a continuation of the study that resulted in the Chief’s Report for the project for Papillion Creek and Tributaries Lakes, Nebraska, signed January 24, 2022. In carrying out the study authorized by subsection (a)(71), the Secretary shall study the South Shore of Long Island, New York, as a whole system, including inlets that are Federal channels. Each study authorized by subsection
(b)shall be considered a new phase investigation and afforded the same treatment as a general reevaluation.
Connectionstraces to 3
12 references not yet in our index
- 64 Stat. 172
- 134 Stat. 2670
- 128 Stat. 1364
- 132 Stat. 3839
- 33 Stat. 1146
- 128 Stat. 1366
- 25 Stat. 406
- 34 Stat. 1080
- 36 Stat. 635
- 76 Stat. 1174
- 36 Stat. 666
- 76 Stat. 1197
Citation graph
cites case law
Sec. 8201
Authorization of proposed feasibility studies
Stat.64 Stat. 172
Stat.134 Stat. 2670
Stat.128 Stat. 1364
Stat.132 Stat. 3839
Stat.33 Stat. 1146
Cites 15 · showing 8Cited by 0 across 0 sources