Sec. 3. Keystone XL pipeline
81 words·~1 min read·
/bill/117/hr/7009/ih/section-3·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
TransCanada Keystone Pipeline, L.P. may construct, connect, operate, and maintain the pipeline facilities at the international border of the United States and Canada at Phillips County, Montana, for the import of oil from Canada to the United States as described in the Presidential Permit of March 29, 2019 (84 Fed. Reg. 13101 (April 3, 2019)). No Presidential permit or any other Executive order shall be required for the construction, connection, operation, or maintenance of the pipeline facilities described in paragraph (1).
Connections1 off-index
1 reference not yet in our index
- 84 FR 13101
Citation graph
cites case law
Sec. 3
Keystone XL pipeline
Fed. Reg.84 FR 13101
Cites 1Cited by 0 across 0 sources