Sec. 3117. Department of Energy study on the W80–4 nuclear warhead life extension program
175 words·~1 min read·
/bill/117/hr/4350/eh/section-3117·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Not later than 30 days after the date of the enactment of this Act, the Director for Cost Estimation and Program Evaluation shall conduct a study on the W80–4 nuclear warhead life extension program. The study under subsection
(a)shall include the following: An explanation of the unexpected increase in cost of the W80–4 nuclear warhead life extension program. An analysis of— the future costs of the program; and schedule requirements. An analysis of the impacts on other programs as a result of the additional funding for W80–4, including— life-extension programs; infrastructure programs; and research, development, test, and evaluation programs. An analysis of the impacts that a delay of the program will have on other programs due to— technical or management challenges; and changes in requirements for the program. Not later than 180 days after the date of the enactment of this Act, the Director shall submit to the congressional defense committees the study under subsection (a), without change. The study under subsection
(a)shall be in unclassified form, but may include a classified annex.