Sec. 152. Treatment of certain benefits and costs
85 words·~1 min read·
/bill/116/s/1811/eah/section-152A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
In the case of a flood risk management project that incidentally generates seismic safety benefits in regions of moderate or high seismic hazard, for the purpose of a benefit-cost analysis for the project, the Secretary shall not include in that analysis any additional design and construction costs resulting from addressing seismic concerns. Except with respect to the benefit-cost analysis, the additional costs referred to in subsection
(a)shall be— included in the total project cost; and subject to cost-share requirements otherwise applicable to the project.