Tap any paragraph to write a margin note. Your notes collect in the Desk below the text and file under cases with @. The side-by-side margin rail opens on a larger screen.

Code · BILL · 116th Congress · H.R. 7575 (Received in Senate) — To provide for improvements to the rivers and harbors of the United States, to provide for the conservation and devel... · Sec. 1

Sec. 1. Short title; table of contents

897 words·~4 min read·/bill/116/hr/7575/rds/section-1·

A research copy — for the controlling text, always check the official state or federal source. Not legal advice.

This Act may be cited as the . Water Resources Development Act of 2020 The table of contents for this Act is as follows: Sec. 1. Short title; table of contents. Sec. 2. Secretary defined. Title I—General Provisions Sec. 101. Budgetary treatment expansion and adjustment for the Harbor Maintenance Trust Fund. Sec. 102. Funding for navigation. Sec. 103. Annual report to Congress on the Harbor Maintenance Trust Fund. Sec. 104. Additional measures at donor ports and energy transfer ports.
Sec. 105. Assumption of maintenance of a locally preferred plan. Sec. 106. Coast Guard anchorages. Sec. 107. State contribution of funds for certain operation and maintenance costs. Sec. 108. Inland waterway projects. Sec. 109. Implementation of water resources principles and requirements. Sec. 110. Resiliency planning assistance. Sec. 111. Project consultation. Sec. 112. Review of resiliency assessments. Sec. 113. Small flood control projects. Sec. 114. Conforming amendment.
Sec. 115. Feasibility studies; review of natural and nature-based features. Sec. 116. Report on corrosion prevention activities. Sec. 117. Quantification of benefits for flood risk management projects in seismic zones. Sec. 118. Federal interest determination. Sec. 119. Economically disadvantaged community flood protection and hurricane and storm damage reduction study pilot program. Sec. 120. Permanent measures to reduce emergency flood fighting needs for communities subject to repetitive flooding.
Sec. 121. Emergency response to natural disasters. Sec. 122. Study on natural infrastructure at Corps of Engineers projects. Sec. 123. Review of Corps of Engineers assets. Sec. 124. Sense of Congress on multipurpose projects. Sec. 125. Beneficial reuse of dredged material; dredged material management plans. Sec. 126. Aquatic ecosystem restoration for anadromous fish. Sec. 127. Annual report to Congress. Sec. 128. Harmful algal bloom demonstration program. Sec. 129. Update on Invasive Species Policy Guidance.
Sec. 130. Report on debris removal. Sec. 131. Missouri River interception-rearing complex construction. Sec. 132. Cost and benefit feasibility assessment. Sec. 133. Materials, services, and funds for repair, restoration, or rehabilitation of projects. Sec. 134. Levee safety. Sec. 135. National Dam Safety Program. Sec. 136. Rehabilitation of Corps of Engineers constructed pump stations. Sec. 137. Non-Federal Project Implementation Pilot Program. Sec. 138. Definition of economically disadvantaged community.
Sec. 139. Cost sharing provisions for territories and Indian Tribes. Sec. 140. Flood control and other purposes. Sec. 141. Review of contracting policies. Sec. 142. Buy America. Sec. 143. Annual report on status of feasibility studies. Title II—Studies and Reports Sec. 201. Authorization of proposed feasibility studies. Sec. 202. Expedited completions. Sec. 203. Feasibility study modifications. Sec. 204. Selma, Alabama. Sec. 205. Comprehensive study of the Sacramento River, Yolo Bypass, California.
Sec. 206. Lake Okeechobee regulation schedule, Florida. Sec. 207. Great Lakes Coastal Resiliency Study. Sec. 208. Rathbun Lake, Chariton River, Iowa. Sec. 209. Report on the status of restoration in the Louisiana coastal area. Sec. 210. Lower Mississippi River comprehensive study. Sec. 211. Upper Mississippi River Comprehensive Plan. Sec. 212. Lower Missouri Basin Flood Risk and Resiliency Study, Iowa, Kansas, Nebraska, and Missouri. Sec. 213. Portsmouth Harbor and Piscataqua River and Rye Harbor, New Hampshire.
Sec. 214. Cougar and Detroit Dams, Willamette River Basin, Oregon. Sec. 215. Port Orford, Oregon. Sec. 216. Wilson Creek and Sloan Creek, Fairview, Texas. Sec. 217. GAO study on mitigation for water resources development projects. Sec. 218. GAO study on application of Harbor Maintenance Trust Fund expenditures. Sec. 219. GAO study on administration of environmental banks. Sec. 220. Study on Corps of Engineers concessionaire agreements. Sec. 221. Study on water supply and water conservation at water resources development projects.
Sec. 222. PFAS review and inventory at Corps facilities. Sec. 223. Report on recreational facilities. Title III—Deauthorizations and Modifications Sec. 301. Deauthorization of inactive projects. Sec. 302. Abandoned and inactive noncoal mine restoration. Sec. 303. Tribal partnership program. Sec. 304. Lakes program. Sec. 305. Watercraft inspection stations. Sec. 306. Rehabilitation of Corps of Engineers constructed dams. Sec. 307. Chesapeake Bay Environmental Restoration and Protection Program.
Sec. 308. Upper Mississippi River System Environmental Management Program. Sec. 309. McClellan-Kerr Arkansas River Navigation System. Sec. 310. Ouachita-Black River Navigation Project, Arkansas. Sec. 311. Sacramento River, Glenn-Colusa, California. Sec. 312. Lake Isabella, California. Sec. 313. Lower San Joaquin River flood control project. Sec. 314. San Diego River and Mission Bay, San Diego County, California. Sec. 315. San Francisco, California, Waterfront Area. Sec. 316. Western Pacific Interceptor Canal, Sacramento River, California.
Sec. 317. Rio Grande Environmental Management Program, Colorado, New Mexico, and Texas. Sec. 318. New London Harbor Waterfront Channel, Connecticut. Sec. 319. Washington Harbor, District of Columbia. Sec. 320. Big Cypress Seminole Indian Reservation Water Conservation Plan, Florida. Sec. 321. Central Everglades, Florida. Sec. 322. Miami River, Florida. Sec. 323. Julian Keen, Jr. Lock and Dam, Moore Haven, Florida. Sec. 324. Taylor Creek Reservoir and Levee L–73 (Section 1), Upper St.
Johns River Basin, Florida. Sec. 325. Calcasieu River and Pass, Louisiana. Sec. 326. San Juan-Chama project; Abiquiu Dam, New Mexico. Sec. 327. Pawcatuck River, Little Narragansett Bay and Watch Hill Cove, Rhode Island and Connecticut. Sec. 328. Harris County, Texas. Sec. 329. Cap Sante Waterway, Washington. Sec. 330. Regional sediment management. Sec. 331. Additional assistance for critical projects. Sec. 332. Project modification authorizations. Sec. 333. Application of credit.
Sec. 334. Project reauthorizations. Sec. 335. Conveyances. Sec. 336. Repeals. Title IV—Water Resources Infrastructure Sec. 401. Project authorizations. Sec. 402. Special rules. Sec. 403. Authorization of projects based on feasibility studies prepared by non-Federal interests. Title V—Budgetary Effects Sec. 501. Determination of Budgetary Effects.
★   the supreme law of the land   ★
Don't Tread on Me
E Pluribus Unum — out of many, one

"If you don't know your rights, you don't have any."

Marginalia · a citizen's law index
A research desk, not legal advice. Always read the cited source before relying on a summary.
Questions or an issue? support@self-law.org
disclaimerMarginalia is a research index, not a law firm. Nothing on this site is legal, tax, or financial advice and no attorney–client relationship is formed by using it. Statutes, regulations, and case law change; summaries, search results, AI output, and member posts may be incomplete, out of date, or wrong. Any interpretation drawn from material on this site should be validated by a licensed attorney in your jurisdiction before you act on it.