Sec. 18. Gas pipeline repair criteria
169 words·~1 min read·
/bill/116/hr/5120/rh/section-18·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
Chapter 601 of title 49, United States Code, is further amended by adding at the end the following: Not later than 1 year after the date of enactment of this section, the Secretary shall issue regulations requiring each operator of a gas pipeline facility to— immediately repair a leak in a gas pipeline facility it operates that results in a large loss event; and report information to the Secretary with respect to such large loss event, including— the location of such large loss event; the total estimated volume of gas released during such event; the cause of the failure; and the time from the detection of a gas leak to the completion of the repair of such leak.
In this section, the term large loss event means the loss of 300,000 cubic feet or more of gas. . The table of sections for chapter 601 of title 49, United States Code, is further amended by adding at the end the following new item: 60143. Gas pipeline repair criteria. .