Sec. 33177. Required dam safety communications between FERC and States
394 words·~2 min read·
/bill/116/hr/2/eh/section-33177A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The Commission, acting through the Office of Energy Projects, shall notify a State within which a project is located when— the Commission issues a finding, following a dam safety inspection, that requires the licensee for such project to take actions to repair the dam and other project works that are the subject of such finding; after a period of 5 years starting on the date a finding under paragraph
(1)is issued, the licensee has failed to take actions to repair the dam and other project works, as required by such finding; and the Commission initiates a non-compliance proceeding or otherwise takes steps to revoke a license issued under section 4 of the Federal Power Act ( 16 U.S.C. 797 ) due to the failure of a licensee to take actions to repair a dam and other project works. If the Commission issues an order to revoke a license or approve the surrender or implied surrender of a license under the Federal Power Act ( 16 U.S.C. 792 et seq.), the Commission shall provide to the State within which the project that relates to such license is located— all records pertaining to the structure and operation of the applicable dam and other project works, including, as applicable, any dam safety inspection reports by independent consultants, specifications for required repairs or maintenance of such dam and other project works that have not been completed, and estimates of the costs for such repairs or maintenance; all records documenting the history of maintenance or repair work for the applicable dam and other project works; information on the age of the dam and other project works and the hazard classification of the dam and other project works; the most recent assessment of the condition of the dam and other project works by the Commission; as applicable, the most recent hydrologic information used to determine the potential maximum flood for the dam and other project works; and the results of the most recent risk assessment completed on the dam and other project works. In this section: The term Commission means the Federal Energy Regulatory Commission. The term licensee has the meaning given such term in section 3 of the Federal Power Act ( 16 U.S.C. 796 ). The term project has the meaning given such term in section 3 of the Federal Power Act ( 16 U.S.C. 796 ).
Connectionstraces to 3
Citation graph
cites case law
Sec. 33177
Required dam safety communications between FERC and States
Cites 3Cited by 0 across 0 sources